Descargar Imprimir esta página

Baxtran BR40 Manual De Instrucciones página 75

Ocultar thumbs Ver también para BR40:

Publicidad

Idiomas disponibles

Idiomas disponibles

4. INSTALATION
RECHARGEABLE BATTERY
!
The used battery is recycled. According to the waste disposal law, rechargeable battery to be used as a special garbage recycling and
specialized handling.
ADJUST MACHINE LEVEL
The machine need to adjust the level ever time when change the install location. Moving the four feet slowly to adjust level.
Rotate the feet until the bubble is in the middle of level device.
5. BASIC OPERATING
5.1 BASIC WEIGHING FUNCTION
PREPARATION
Turn on machine: Press (ON/OFF) Key
WARM UP TIME:
For making sure the weighing result correct, different type machine need different warm up time to reach the required operating temperature.
Please refer the specification list to know the correct warm up time.
INSTANCE
KEY (ORDER)
!
Only available for using adapter to recharge the rechargeable battery for machine.
Lie down the machine at side.
Open the battery box cover.
Connect and put rechargeable battery in box.
Confirm the positive and negative correctly.
Close the battery box: Screw the battery box cover adown to the machine.
STEP EXPLANATION
1. Zero Stable
2. Put container on weighing pan (Example: 100g)
3. Press Tare key for tare the container weight
4. Put sample in container (Example: 200g)
USER'S MANUAL ABS
LCD SCREEN DISPLAY
100.00 g
0.00 g
200.00 g
EN
75

Publicidad

loading