Descargar Imprimir esta página

Thermo Scientific SWB 15 Manual Del Usuario página 50

Publicidad

3
Installation | Section 3
Chapter 3 Installation
Bath Installation
The bath is designed for continuous operation and for indoor use.
Never place the bath in a location where excessive heat, moisture or corrosive
CAUTION
materials are present.
The installation platform must be capable of withstanding the shaking generated when
CAUTION
the bath is in operation.
Ventilation
No special ventilation clearances are required.
Cover Installation
Figure 3-1 – Shaking Bath Cover Installation
Precision | 3-1
Thermo Scientific

Publicidad

loading

Este manual también es adecuado para:

Swb 15sDub 15Swb 27