Section 3 | Installation
Filling Requirements
Ensure the reservoir drain port is closed and that all plumbing connections are securely plumbed
or capped. Also ensure any residue is thoroughly removed from the reservoir before filling.
To avoid spilling, place your samples/trays into the bath before filling. Also make allowance for
splashing of water from tray oscillation movement.
Slowly fill the reservoir. When adding, point the opening of a container away from yourself.
Fill the reservoir with a minimum of one inch and a maximum level one inch lower than the tray
shaft fitting.
Note Monitor the fluid level whenever heating the fluid.
To conserve energy, reduce evaporation, and increase temperature control accuracy, use the
supplied gable cover. Do not use aluminum foil as a cover, as it may cause corrosion due to an
electrochemical reaction.
3-6 | Precision
Thermo Scientific