WATER CONNECTION
To make the connection, connect the mains line to
the appliance's connection pipe, fitting a shut-off
tap (A), to allow the water supply to be cut off when
necessary. Easily accessible filters must be fitted
downstream of the tap.
Description
Pressure
pH
Conductivity
Hardness
Salt and metallic ion
content
Chlorides
Sulphates
Iron
Copper
Manganese
CONVERSION OF GAS SUPPLY
The constructor has tested the appliance with its
own mains gas, identified by the sticker applied to
the nameplate.
If the type of gas to be connected is different from
IT
that used for testing, proceed as follows.
1 - Turn off the gas supply tap (A).
GB
2 - Change the burner nozzle (see page 19)
3 - Change the pilot light nozzle (see page 20)
DE
4 - Adjust the minimum and amximum settings on
the gas control valve (see page 17)
5 - If necessary, replace the primary air bushing of
FR
the burner (see page 19)
6 - Remove the sticker from the nameplate and ap-
ES
ply the new one to identify the gas being used.
Important
On completion of the operation, make sure
that there are no gas leaks or malfunctions.
English
Value
200÷450 kPa (2÷ 4,5 bar)
7÷7.5
< 200 mS/cm
9÷13° f (5÷7° d, 6.3÷8.8° e,
90÷125 ppm)
< 30 mg/l
< 40 mg/l
< 0,1 mg/l
< 0.05 mg/l
< 0,05 mg/l
- 16 -
A
Important
The appliance must be supplied with drink-
ing water having the characteristics shown
in the table.
A
IDM-39605900700.tif
IDM-3960200240.tif
IDM-3960200250.tif