If the fixing of the unit must be in a dangerous place
for the operator, the safety precautions provided for
by the work's regulation must be taken to exclude
any risk uncontrolled in this operation. It is perhaps
better in this case to implement the hoisting cable
into the device before the anchoring operation.
INSTRUCTION MANUAL
Electrical winches MOTRIX types 526&527
2 Installation and Use
2.1
Instructions for installation, assembly,
commissioning and use - training
Installation and use operations must be performed
by personnel specially trained by the manufacturer
or its dealers, duly authorized by their employer.
Depending on your country, regulatory inspections
may be necessary.
Make sure you have:
- A sufficient length of special cable (Ø8.3, 9.5
or 10.3mm according type)
- An adequate length of supply cable and
suitable number of wires with suitable cable
section,
- Accessories you may wish to use
The reaction in the anchorage of hoist and/or
pulley are different according your installation;
check your case with a qualified technician :
2.1.1 Assembling the options
2.1.1.1 Reeving kit 030054 for Motrix 1000
(527E 527N)
he assembly described below will allow you to lift a
double load (2:1 reeving). The load limiter built
into the Motrix will measure the tension in only one
of the rope lines.
Remove the Motrix hook and associated plates.
Insert the part between the body of the winch and
the electric housing:
Ref: 1813000210
Page: 6/21
Version: 42/22