PS: a second stopper is provided to stop the
descent: install it at the end of the wire rope.
Guide the wire rope through the guiding device:
Note: Leave at least 2 m of cable after the stop "low
limit switch".
INSTRUCTION MANUAL
Electrical winches MOTRIX types 526&527
Check the operation of the limit switches of the
winch.
Ensure that the cable above the hoist (taut) does not
touch surfaces or angles.
Ensure that the outgoing winch cable (slack) is free
and passes through the guiding piece.
Do not let the loaded rope become slack if the load
is not stable, resting on a strong enough support.
2.1.6 Break-in of a new cable
In accordance with ISO4309, prior to the
operational commissioning of the cable on your
winch and in order to allow the components of the
cable to better adjust to normal operating
conditions, it is necessary to perform 2 complete
cycles under a low load (30 to 50% of WLL).
2.2
Diagrams and safety explanations
Installation and use operations must be
performed by personnel specially trained by the
manufacturer or its dealers, duly authorized by their
employer.
The maximum capacity of the hoist (WLL) should
be the basis for calculations of anchor strength.
Ref: 1813000210
Page: 11/21
Version: 42/22