USER AND INSTALLATION MANUAL
3. INSTALLATION
Paste the supplied installation template paper in position on
the wall, ensuring that the reference line is level using a spirit
level.
Use the template to mark the position of the screws for the
hanging rail, using a spirit level to ensure it is straight and level.
Drill the marked holes using a suitable 8mm drill bit and insert
wall plugs. Line the hanging rail with the holes, and fix the rail
into position using the supplied screws.
Ensure that the hanging rail is securely fastened onto the wall,
and that there is no risk of the unit tipping or falling.
40
This unit must be installed on an external wall, as it vents directly
out of its rear.and ensure the wall is flat, solid and reliable.
Leave at least 10 cm of space to the left, right and base of the
machine. At least 20cm of space must be left above the unit
to help air flow smoothly and stay away from curtains, plants,
faucets, furniture and others appliances etc.
Use a 180 mm core drill to drill the two holes for the units
ventilation, ensuring that both the holes are aligned with the
template. ensuring that the holes are at a downward angle
(min 5 degrees) and aligned with the template.
The hole for the drainage pipe must be drilled using a 25mm
Drill bit.
Ensure the hole is at a downward angle (min 5 degrees) so
that the water will drain correctly.
MONOBLOCK UNIG