Descargar Imprimir esta página

SOLAX X3-IES-4K Manual De Instalación página 130

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 17
• Wall Mounting / Wandmontage / Montage mural / Montaje en pared / Montagem na
parede / Wandmontage / Montaggio a parete / Montaż naścienny / Montáž na stěnu
/ Väggmontering / Montare pe perete / Стенен монтаж / Vægmontering / Στερέωση
σε τοίχο / Seinakinnitus / Seinäasennus / Montaža na zid / Fali szerelés / Montavimas
ant sienos / Sienas montāža / Montáž na stenu / Montaža na steno / Duvara montaj /
Montagem na parede / ‫التثبيت على الحائط‬
The installation option B with three battery modules is taken as an example.
One Tower
Step 1 Prepare and install the base support and battery modules.
Before installing, please refer to
the Step 1 of the Floor Mounting
to remove the dust covers.
Tighten screws on both sides.
1
*Note: 1. The distance from the base support to the ground is decided according to the local
regulations. And it is also the distance from the base to the ground. For the safety concerns, it is
suggested that the height from the ground not be too high.
2. Leave enough distance to the ceiling to install the inverter.
2
3.Check whether the bubble is in the centre, if not, slightly bow it to the horizontal.
126
Ground
M5 * 8
2.2-2.5 N·m
Cylindrical plastic
bubble spirit level

Publicidad

loading

Este manual también es adecuado para:

X3-ies-5kX3-ies-6kX3-ies-8kX3-ies-10kX3-ies-12kX3-ies-15k