Descargar Imprimir esta página

SOLAX X3-IES-4K Manual De Instalación página 170

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 17
and negative PV port (in MPPT voltage range 110-950 V) or check whether the
positive and negative poles of PV cables are reversed.
Step 3:
Switch the BAT switch to the "ON" position. Press and hold the BAT button for 1-2
seconds (at the point, the SoC indicators will rapidly flash yellow lights and then
turn to flash green lights).
• The button is in OFF status by default.
• A system problem may be encountered while pressing the button frequently. The
user may need to wait at least 10 seconds and then try again.
Step 4: Turn on the inverter system BUTTON.
166
NOTICE!

Publicidad

loading

Este manual también es adecuado para:

X3-ies-5kX3-ies-6kX3-ies-8kX3-ies-10kX3-ies-12kX3-ies-15k