DIP
Description
switch
Selection of refrigerant
1
pipe length
Backup heater outlet
2
temperature thermistor
S1
installation
The first inner backup
3
heater installation
The second inner backup
4
heater installation
10.2.2 Maximum operating current setting
DIP switch is located on the main board (see "9.3 Electronic control box"), This function is only for single-phase models (Three
phase model this function reservation), if the user configuration load is small, please select the dial code type according to the
actual load.
Switch off the power supply before opening the switch box service panel and making any changes to the DIP switch
settings.
If you choose to reduce the maximum current operation, the machine effect will be affected by different levels.
5/7/9kW (1-phase)
DIP switch
SW3
0N
000
20 A
1 2
3
0N
001
18 A
1 2
3
0N
010
16 A
1 2
3
0N
011
14 A
1 2
3
10.3 Initial start-up at low outdoor ambient temperature
During initial start-up and when water temperature is low, it is important that the water is heated gradually. Failure to do so may
result in concrete floors cracking due to rapid temperature change. Please contact the responsible cast concrete building
contractor for further details.
To do so, the lowest water flow set temperature can be decreased to a value between 25°C and 35°C by adjusting the FOR
SERVICEMAN. Refer to "FOR SERVICEMAN/special function/preheating for floor" .
10.4 Pre-operation checks
Checks before initial start-up.
DIP
ON
OFF
switch
Additional heating source outlet
/
Default
1
temperature thermistor
installation
Not
Installed
2
installed
S2
Not
Installed
3
installed
Not
Installed
4
installed
WARNING
12/14/16kW(1-phase)
DIP switch
SW4
0N
30 A
1 2
0N
28 A
1 2
0N
26 A
1 2
0N
24 A
1 2
142
Description
5/7/9kW (1-phase)
12/14/16kW(1-phase)
SW3
100
12A
3
101
12A
3
110
12A
3
111
12A
3
ON
OFF
Not
Installed
installed
SW4
22 A
20 A
18 A
16 A