Wiring; Installation Wiring Notes - Mitsubishi a2 Serie Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 452
α
2 Simple Application Controllers
4.

Wiring

Note;
• Refer to chapter 9 when wiring the AL2-ASI-BD.
• Refer to chapter 11 when wiring the AL2-2DA.
• Refer to chapter 12 when wiring the AL2-2PT-ADP .
• Refer to chapter 13 when wiring the AL2-2TC-ADP .
4.1

Installation Wiring Notes

The wiring of
trained in the local and national electrical standards should perform all tasks associated
with the electrical wiring of the
any wiring operations.
• Input and output cables should not be run through the same multicore cable or share the
same wire.
• Do not lay input/output cables near high voltage power cables.
• Input and Output cable length must be less than 30m (98' 5").
Allow for voltage drop and noise interference with input/output lines used over an extended
distance. Please use wire that is properly sized for the current load.
The terminal will accept a 3 mm flathead screwdriver.
α
2 Series has been designed to be safe and easy. A technician or engineer
α
2 Series controllers. Turn OFF the Power before performing
Wiring 4
ENG
ENG-17

Publicidad

Tabla de contenido
loading

Tabla de contenido