User Manual
Operating Instructions
Lubricant Distribution within the Metering Device, continuation
Fig. 16
Phase 7 & 8: Metering piston B supplies V1, Control piston B supplies V2
Phase 7
In phase 7, control piston A has reached its final position
on the right side.
Thereby it opens the junction channel to the left end of
control piston B and metering piston B.
Now the lubricant pressure P is at the left end of control
piston B and metering piston B.
Due to the larger diameter, lubricant pressure P first
moves the metering piston B (black arrow) to the right and
then supplies the enclosed lubricant on the right side of
metering piston B to outlet 5 (V1).
Notes:
Page 12 of 26
LINCOLN GmbH • Postfach 1263 • D-69183 Walldorf • Tel +49 (6227) 33-0 • Fax +49 (6227) 33-259
Operation, continuation
Phase 8
When the metering piston B reaches its final position on
the right side, lubricant pressure P moves the control pis-
ton B (black arrow) to the right and additionally supplies
the enclosed lubricant on the right side of control piston B
to outlet 5 (V2).
The total output on outlet 5 is the output of metering pis-
ton B and control piston B (V1 + V2).
NOTE
The upper figure shows the transition from
phase 7 to phase 8.
Fig. 12 and fig. 13 (see page 9) show ex-
emplary schematics of the movements of
6001a02
metering and control pistons.
2.2A-20003-B07
6501y05