Page 21
Nature
Fusion Soft Installation and Operation Manual
2®
Flow, Salinity, Temp Sensors
CHLORINE GENERATOR
Factory wired to Multiplex Board
USER INTERFACE
To AquaLink® RS
J12
J13
PRIMARY
CHLORINE GENERATOR
TRANSFORMER
CHLORINE GENERATOR
J11
POWER INTERFACE
SECONDARY
J10 J8
HEAT SINK
L - BRACKET
(Middle primary wires not used)
BLACK
BLK/YEL
Filter Pump Relay
Aux. 3 Relay
Wire Nut to
To Electrolytic
120 VAC Power
Cell
Blower
(120 VAC)
Multiplex Board
(J1 through J4)
Breakers
Filter Pump
(240 VAC)
Ground
Figure 12.
240 VAC Wiring Diagram for the AquaLink
®
RS PureLink
TM
System