INTRODUCTION
The boilers produced in our factory are built with attention to the individual components so as to protect both the user and
the installer from any accidents. It is therefore recommended that after any intervention on the product, the authorised sta
pay particular attention to the electric connections, especially the stripped parts of the wires. These must not escape from the
terminal board in any situation, thus preventing possible contact with the live parts of the wire.
The instruction manual is an integral part of the product: make sure that it always accompanies the appliance, even if transferred
to other owners or user or is transferred to another place. If it is damaged or lost, request another copy from the area technician.
This generator must be intended for the use it has been speci cally made for. The manufacturer is exemptded from any liability,
contractual and extracontractual, for injury/damage caused to persons/animals and objects, due to installation, adjustment and
maintenance errors and improper use.
INSTALLATION
Installation of the generator and auxiliary equipment in relation to the heating system must comply with all current Standards
and Regulations and to those envisioned by the law. Installation must be carried out by authorised sta , who must provide
the buyer with a declaration of conformity for the system and will assume full responsibility for nal installation and as a
consequence the correct functioning of the installed product.
It is necessary to bear in mind all laws and national, regional, provincial and town council Standards present in the country the
appliance has been installed.
The Manufacturer cannot be held responsible for the failure to comply with such precautions. It is recommended to wash all
the pipes of the system well before installation to remove any residue that could compromise the correct operation of the
appliance. During installation, inform the user regarding:
a. If water leaks, he must close the water supply and promptly inform the after-sales technical service.
b. The system working pressure must be checked periodically. If the generator is not used for a long period of time, it is
recommended to contact the after-sales technical service to carry out at least the following operations:
- Set the master switch to position 0.
- Close the water taps of both the heating system and the domestic hot water system.
- Empty the heating system and the domestic hot water system if there is risk of freezing.
COMMISSIONING
After removing the packaging, ensure that the content is intact and complete.
Otherwise, contact the dealer where the appliance was purchased.
When commissioning the product, verify that all safety and control devices the generator consists of work properly. All electrical
components that make up the generator must be replaced with original spare parts exclusively by an authorised technical
assistance centre, thereby guaranteeing correct operation.
Before leaving the system, the sta in charge of commissioning must monitor the operation of the generator for at least one
complete work cycle. The geneerator must be serviced at least once a year, programming it in advance with the technical
assistance centre
STANDARDS
The boilers have been designed and realised in compliance with the following Directives:
UNI EN 303-5 Boilers for central heating. Boilers for solid fuel, with manual and automatic feeding, with a nominal heat
output of up to 500 kW
DIRECTIVES
2004/108/EC: EMC directive
2006/95/EC: Low voltage directive
2006/42/EC: Machinery directive
2011/65/EU: RoHS 2" directive
FOR SAFETY
It is forbidden for the generator to be used by children or unassisted disabled persons.
Do not touch the generator when you are barefoot or when parts of the body are wet or humid.
The safety and adjustment devices must not be modi ed without the authorisation or indications of the manufacturer.
Do not pull, disconnect, twist electric cables leaving the gnerator, even if disconnected from the electric power supply
mains.
ENGLISH