Installation And First-Time Startup; Operation; Controls - Rancilio EPOCA E Instrucciones Originales

Ocultar thumbs Ver también para EPOCA E:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 65

6.2. Installation and first-time startup

 Position the machine unit onto the horizontal sur-
face provided for that purpose and adjust the base
feet to ensure that the machine is stable and that
vibrations are limited.
Before connecting, thoroughly wash the mains water
pipes:
 Leave the water supply taps running at full pres-
sure for several minutes.
 Connect to the mains water supply.
 Connect the machine up to the power supply
mains.
Thoroughly wash all the water pipes of the machine:
 Leave the water supply taps running at full pres-
sure.
 Switch on main switch (Fig. 3-10); wait until the
boiler fills up to the level set.
 Switch on boiler switch (Fig. 3-11) to begin heating
the water in the boiler.
 Once standard machine work conditions have
been reached with the machine in "ready for
operation"mode, switch the machine off and
empty all the water filled into the water circuit the
first time, there by eliminating any possible initial
impurities.
 Fill the machine up with water again and set it into
standard operation mode.
 Once the "ready for operation" status is reached:
- Connect the filter-holders to the dispenser
units(without coffee); operate each group head in
order to allow the water to escape for about one
minute.
- Dispense hot water until at least 5 liters of water
have been dispensed.
- Open each steam dispensing point for 1 whole
minute.
Once installation is terminated, the installa-
tion technician MUST issue an installation
report.
ATTENTION
Please be informed that in order to avoid
pressure falls during the boiler filling we fit-
ted into the filling solenoid valve a restription
Ø 1.25 mm.
If, during the installation, the machine get in security
mode (the on/off selection on the touch pad will flash)
reset the machine using the main switch.

7. OPERATION

7.1. Controls Fig.3
1 Steam supply tap
Tap: turn in an anticlockwise direction to open and
clockwise to close.
3 Hot water supply tap
Tap: turn in an anticlockwise direction to open and
clockwise to close.
6a Coffee dispenser switch (mod. S)
On pressing the button, continuous coffee dispens-
ing begins and the led comes on.
On re-pressing the switch, the coffee delivery stop
sand the led goes out.
6b Electronic coffee delivery button panel (mod.
E). Five buttons with relative led:
A Press the button for a second, led on, release
button; a small coffee is dispensed. The led turns
off and dispensing ceases.
B Press the button for a second, led on, release
the button; two small coffees ar dispensed from
the same unit. The led turns off and dispensing
ceases.
C Press the button for a second, led on, release
the button; a big cup of coffee is dispensed. The
led turns off and dispensing ceases.
D Press the button for a second, led on, release
the button; two big cups of coffee are dispensed
from the same unit. The led turns off and dispens-
ing ceases.
E Press the button for a second, led on, release
the button; coffee is continuously dispensed. Press
the button for a second, led off, release button;
continuous dispensing of coffee ceases.
To interrupt brewing once the operation has been
activated with buttons A-B-C-D, press the same
button again or press E.
10 Main switch.
Two-position switch with led. Turn on the switch,
led on, the machine is turned(apart from the boiler)
and the pump is turned onto fill the boiler;
11 Boiler resistance switch
Two-position switch with led.
On activating the switch, the led comes on, and po-
wer is supplied to the resistance for the boiler water.
57

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Epoca sEpoca – s-tank

Tabla de contenido