Mounting the Second Connection
6A53
Required tools and materials:
>
710D4 Torque Spanner, 636K13 Loctite® 241
► Connect the pyramid adapter with the applicable connecting compon
ent.
6A54
Required tools and materials:
>
710D4 Torque Spanner, 636K13 Loctite® 241
1) For definitive mounting:
Use Loctite® to secure the grub screws.
2) Screw in the grub screws.
3) For trial fitting:
Use the torque spanner to tighten the grub screws (tightening
torque:10 Nm).
For definitive mounting:
Pre-tighten the grub screws with the torque spanner (tightening torque:
10 Nm) and then tighten (tightening torque: 15 Nm).
4) Replace any grub screws that are protruding or recessed too much with
suitable ones (see selection table).
Reference Number
506G3=M8x10
506G3=M8x12-V
506G3=M8x14
506G3=M8x16
6 Maintenance
•
The prosthesis components should be inspected after the first 30 days of
use.
•
Inspect the entire prosthesis for wear during normal consultations.
•
Conduct annual safety inspections.
7 Legal Information
7.1 Liability
The manufacturer recommends using the device only under the specified
conditions and for the intended purposes. The device must be maintained
according to the Instructions for Use. The device must only be operated with
Selection Table for Set Screws
Length (mm)
10
12
14
16
Ottobock | 13