Descargar Imprimir esta página

Garage Door Opener Installation - Genie Excelerator Manual De Uso

Publicidad

G
D
ARAGE
OOR
For lightweight garage doors, make sure you have installed
the proper reinforcement (See Check Door Condition and
Thickness on page 3).
Installation Step 1:
The Header Bracket must be fastened to the garage
framing. Do Not fasten the Header Bracket to drywall,
particle board, plaster, or other such material.
It may be necessary to attach a 2" x 6" board across the
wall studs above the door header to serve as a
mounting plate for the Header Bracket. The Bracket can
then be mounted at the proper location and have
sufficient support.
If a door spring is in the way, place the Header Bracket
above the spring. Do Not move the door spring.
A
If needed, attach a 2" x 6" board (Figure 18) (also see page 4)
with at least two (four is recommended) Lag Screws and Flat
Washers (not supplied).
OPEN ORANGE PARTS BAG
B
Attach Header Bracket to header at mark above door.
Mounting variations are shown in Figure 17. Any of these
may be used depending on space. However, it is critical that
the point where the Rail attaches to the Header Bracket be
on the center line of the door.
Mark 3 hole positions.
Drill 3 (5/32") pilot holes.
Attach Header Bracket with 3 (1/4" x 2") Lag Screws.
12
O
I
PENER
NSTALLATION
NOTE
C
I
H
H
NSTALL
EADER
CAUTION
NOTE
Mount directly
Center Line of door
Bottom of
B
bracket flange
RACKET
Figure 18 Attach Header Bracket above Garage Door
Door Bracket
For Help, call 1-800-35-GENIE or visit www.geniecompany.com
Use of Header Bracket
support board
into header
Center Line of door
Highest Point of door travel
+ 2-1/2" (sectional door) or
+ 6" (one-piece door)
5/16-18 x 3/4"
Hex Head Bolts
Header
Bracket
5/16-18 x 3/4"
Hex Serrated Flange Nuts
1/4" x 2"
Lag Screws
Self-Drilling Screws
Hardware (orange bag)
1/4"-20 x 3/4"

Publicidad

Capítulos

loading