G
D
ARAGE
OOR
C
Assembly Step 1:
H
OPEN BLUE PARTS BAG
A
Turn Power Head upside down and place on a flat
level surface.
B
Install Coupler on Motor Shaft (Figure 9).
CAUTION
The Drive Screw and Rail Liner can slide out of Rail Sections.
Keep Rail Sections level until the Opener is fully assembled.
C
Connect first Rail Section to Opener Power Head. Connect
with 2 (1/4"-20) (yellow) Hex Head Shoulder Bolts and
2 (1/4" -20) Hex Serrated Flange Nuts (Figure 10).
Finger-tighten until later.
D
If you have a 1-piece rail unit, skip Assembly Step 2.
C
H
Assembly Step 2:
A
Arrange arrows on Rail Sections to point in same direction
and away from Power Head:
•
Push Middle Drive Screw out about 2" toward Power Head.
•
Slide Collar over Middle Drive Screw Hook (Figure 11A).
•
Turn Middle Screw by hand to align Drive Screw Hooks
between First and Middle Rail Sections.
•
Latch two Hooks together and slide Collar over them
(Figure 11B) and (Figure 11C).
•
Snap Clip on Drive Screw next to Collar (Figure11D).
B
Attach Middle Rail Section to First Rail Section, using 2 Rail
Clamps, 4 (5/16"-18) Hex Shoulder Bolts, and 4 (5/16"-18) Hex
Head Serrated Flange Nuts onto Bolts (Figure 11).
Finger-tighten until later. (Middle Rail Section looks the
same on both ends. See page 8.)
C
Attach End Rail Section to Middle Rail Section following
procedures in step A & B.
If the Extension Assembly (GSXL8) is needed, attach
it per instructions supplied with kit.
Retaining Clips
Middle Rail
Section
For Help, call 1-800-35-GENIE or visit www.geniecompany.com
O
A
PENER
SSEMBLY
C
R
P
ONNECT
AIL TO
OWER
H
EAD
I
R
NSTALL REMAINING
S
ECTIONS
NOTE
Collar
Figure 11 Attach Middle Rail Section
Rail Strap
Serrated Flange Nuts
Carriage
Coupler
First Rail
AIL
Section
Figure 9 Install Bumper, Coupler and 1st Rail Section
Figure 10 Bolt 1st Rail Section to Power Head
Arrows point toward door
Rail Clamps
5/16"-18 Hex Head Shoulder Bolts
5/16"-18 Hex Serrated Flange Nuts
1/4"-20 Hex
1/4"-20 Hex Head
Shoulder Bolts
(yellow)
Collars + spare Retaining Clips + spare
Stop
Hardware (blue bag)
Power Head
Assembly
Coupler
11A. Slip on collar
11B. Engage Hooks
11C. Slide Collar over Hooks
11D. Snap on Retaining Clip
1/4"-20 Hex
Head Bolts
9