Extraction arm
length
2 m, 3 m, 4 m
5 m, 6 m, 7 m
7 m, 8 m
9 m, 10 m
Information:
Using the extraction arm length and the specifications for the
extraction arm components made in the comments to determine the
dimension "A" before you drill the mounting holes!
Check or ensure sufficient load-bearing capacity of the wall or column before
-
starting assembly.
Tensile forces of approx. 3000N (approx. 300Kg) per fitting screw occur on the
-
upper fitting screws of the MaxiFil bracket.
The torque of the MaxiFil bracket is approx. 2900Nm.
-
Only use screws in a strength class as of 8.8 with a diameter greater than or
-
equal to 10mm.
Ensure sufficient distance between the cooling fan from the motor to the
-
ceiling, at least 60mm.
Draw the drill holes for MaxiFil (item 1) and for the controller brackets (item 2)
according to specifications in the drawing/table.
Drill the holes and fit the 4 screws for MaxiFil (item 1) in such a way that the
tabs of the MaxiFil (item 1) can be mounted there. For this purpose, "large"
washers (e.g. As per DIN 9021, DIN EN ISO 7093) have to be used with the
screws.
Now lift the pallet with the MaxiFil (item 1) with a forklift and position it in such
a way that you can mount it safely at the fixing screws.
Tighten the fitting screws and make sure that the MaxiFil is secure (item 1)
before you lower the pallet using the forklift.
Mount the controller brackets (item 2).
KEMPER MaxiFil stationary - operating instructions- EN
With wall bracket item-no.: 91 130 04
With boom 4 m item no.: 79 114 07
With boom 6 m item no.: 79 116 07
- 70 –
Technical modifications and errors expected.
Comment
-
A [mm]
2,420
3,070
3,310
3,510