UNPACKING/ASSEMBLY
WARNING
Carry out the unpacking, assembly, lifting and installation operations described below
with care.
Failure to comply with these recommendations may damage the machine and put the
operator's safety at risk.
- Remove the upper part of the packaging, if provided. Make sure that the machine has
not been damaged in transit, and identify the points at which it is anchored to the pallet
- 2 fig. 1.
- The machine comprises five main sections (fig. 1 and fig. 2):
1 supporting structure with controls and tools
2 body with pedal unit and self-centring turntable device
3 air tank (T.I. version only)
4 wheel lift (optional)
5 support unit (optional)
See fig.2
- Remove the packaging from the air tank 3 or the optional units 4 and 5, and place them
in a position where they cannot fall over and be damaged.
- Fit the wheel lift unit 4 on the side of the body, securing it with the screws and washers
A.
- Remove the perimeter casing of the body, fit the wheel support unit 5 on the front of
the body, fixing it in place with the screws and washers B, and replace the casing.
- Connect the connection of the tank 3 to the air connection hose provided, securing it
with a band clamp. Secure the air tank 3 to the machine using the bracket C provided,
with the nuts and washers D (T.I. version only).
To remove the machine from the pallet connect to it by means of the lifting bracket 1
provided, as shown in fig. 3.
This lifting point must be used whenever you need to change the installation position of
the machine. Do not attempt to move the machine until it has been disconnected from
the electricity and compressed air supply systems.
Artiglio Master operator's manual
LIFTING/HANDLING
EN
43