Fixing The Rear Operator Mounting; Temporary Installation Of The Operator - VDS PH Instrucciones Para La Instalación

Ocultar thumbs Ver también para PH:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.2

FIXING THE REAR OPERATOR MOUNTING

Position the rear mounting
previously measured and weld it on the anchorage plate
with two weld points (C9).
Check the lengthwise and crosswise alignment of the
mounting
(C10)
with a water level.
Complete the welding and clean away the residues with
a wire brush.
!
Warning
Before welding, ensure that there are no bushes
(B4 pos. 5) in the mounting, and that the fi tting
hole is properly protected from weld residues.
When the welded zone has cooled down, apply a
coat of anti-rust paint.
4.3
TEMPORARY INSTALLATION OF THE
OPERATOR
Temporarily mount the operator to fi nd the correct fi xing
position of the front mounting.
!
Warning
Handle the operator with care during assembly.
Fit the fork (C11 pos. 1) to the operator bottom. Lock the
fork with the special pin (C11 pos. 2) and fi x both with
the two snap rings (C11 pos. 3).
Fit the two vibration damping bushes
and below the mounting.
Position the fork of the operator on to the mounting and
lock it with the vertical pin (C13 pos. 5)
abundantly.
!
Warning
Grease both the pin and the housings
(B4 pos. 4) at the height
(C12 pos. 4) above
after greasing
abundantly.
- 21 -
C9
C11
1
2
3
3
C12
Installation
C10
C13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ph1

Tabla de contenido