4. MECHANICAL INSTALLATION
The B200 is an operator for gates with a weight of max. 600 Kg and a length of max. 8m / 12 m.
The gate operator operates by forcing a drive rack by a drive gear.
The gate operator must be installed on the inside of the gate.
Fig.1
Standard installation
1) B200
2) Photocell left
3) Photocell right
4) Mechanical safety edge
5) Key push botton
Gate arrangement
Before starting with the installation check if all the gate parts (fixed and mobile) have a strong and as less as possible
deformable structure, also make sure that :
a) The leaf is rigid and compact;
b) The inferior slideway is perfectly straight, horizontal and without any obstacles which could obstruct the gate sliding;
c) The inferior sliding wheels are equipped with greasable or water tightened bearings;
d) The superior slideway has been produced and placed so that the gate is in a perfect vertical position;
e) Mechanical stops of the leaf are always installed in order to avoid possible derailment of it.
Concrete pad
The base unit of the gate operator requires a concrete pad in order to maintain proper stability.
approximately 450mm x 300mm x 200mm deep in order to provide for adequate weight and structure to insure proper stable
installation.
Anchors (see Fig.2)
You can use anchor bolts, anchors, wa shers and nuts. These anchors must be set into the concrete when it is poured or you can use
wedge anchors to fasten the operator.
67411305
1
2
6) Flasher
7) Receiver
8) Junction box
9) Differential 16A - 30mA
5
3
Rev.06 - 06/2015
6
7
4
8
9
The concrete p ad should be
English
9