HYDRAULIC CONNECTION
Correct dimensioning of the boiler and the
heating system, as well as the choice of type of
system to install are the tasks of the installation
technician and/or planner.
If installation of the boiler includes integration
with another pre-existing system using a gas,
diesel, wood-burning boiler, it must be carried
out by qualifi ed staff who will issue documen-
tation on correct installation according to the
standards in force in each country (for example
in Italy pursuant to M.D. 37/2008 and pursuant
to the standard UNI 10412-2).
output 1" 1/4
safety exchanger 1/2''
return 1" 1/4
discharge 1/2''
INSTALLATION
It is important to wash the entire system
before connecting the boiler to eliminate
deposits and residue in compliance with
Standard UNI 8065 (water treatment in heat-
ing systems for residential use).
Install shut-off valves upstream of the boiler
to insulate it from the rest of the system if
any movement or maintenance operation is
necessary.
With a closed hydraulic system circuit, working
pressure must be between 1 and 2 bar and you
need to install a thermal relief valve.
output 1" 1/4
output
- 57
-
safety exchanger 1/2''