V
Fig. 7
X
Fig. 8
INSTALLATION
Fig 7
• Remove the ash-tray hooking mechanism (V) before
removing the front lever (V1).
Fig 8
• Detach the pellet hopper structure (Z) from the boiler
block (X) by removing the two screws (Y) positioned at
the base of the structure and the four screws (W) positio-
V1
ned on the hydraulic kit..
W
Y
- 73
-
W
view
of the
hydraulic
kit from
the rear
Z
W
Y