Zhermack VAP 6 Manual De Instrucciones página 145

Ocultar thumbs Ver también para VAP 6:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 165
MAINTENANCE AND USE MANUAL
Fig. 8: Place the steam generator on the work bench
and the softener on the floor, making sure both are level
(see section 6.3.1).
Fig. 9: Connect up the water softener to the mains
water supply by attaching the hoses to the inlet tap (29)
and water outlet tap (26) on the softener itself. Then
tighten the hose clips.
Connection to the water softener must
only be effected by qualified, authorised
personnel.
Fig. 10: Connect the water outlet hose (31) on the
softener directly to an open siphon (this must be below
the softener).
Before connecting up the hoses, remove
any rubber plugs inserted in the inlet/
outlet connectors on the AD 8 water
softener.
Fig. 11: To ensure that the resin in the exchanger gives
the required performance rinse the softener by turning
the knob (30) to position number "4" (backflow position:
see fig. 4, section 3.4) for at least 10 minutes until the
water outflow is perfectly clear.
When doing this direct the water into the open siphon
(see previous figure).
VAP 6 / 6A - AD 8
EN
FIRST-TIME USE - VAP 6A
Figure
Figure
Figure
Figure
6.6
8
9
10
11
145 of 328

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vap 6aAd 8

Tabla de contenido