Connection Diagram - Speck BADU OmniTronic Traducción De Las Instrucciones Para El Manejo Originales

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 228
Installation
5.3.3

Connection diagram

Level sensor
(optional)
BADU Eco VS or
BADU Eco Touch-Pro
control cable
ground, rd, br, gr, wh
Fig. 5
To connect the cables, first pull the plug off the pin header
upwards. The wire strands pressed together with ferrules can
therefore be conveniently inserted below the orange openings.
28 EN
3 digital inputs with 230 V
N, AC1, AC2, AC3
(PE distributor terminal
present)
5 potential-free digital inputs
DNG, DCx
2 relay outputs
Z1, Z2, Z_, 11, 14, 12
Pump (max. 4 A) with
asynchronous motor
Lp, Np
Supply
L, L, N, N
WG27.50.118-2-P
05|2018

Publicidad

Tabla de contenido
loading

Tabla de contenido