CHAPTER 2. TRANSPORT AND INSTALLATION.
Knocks and sudden movements must be avoided when transporting the equipment. In any case, the
packaging must be protected from water.
2.1. ELECTRICAL SUPPLY INSTALLATION.
The electrical installation of the equipment making up the system must be carried out by specialised
personnel according to the standards in force.
The location must meet the following requirements:
Place: Dry and ventilated, far enough away from the welding area in order to prevent the metal dust
caused by the welding process from getting into the equipment. The equipment must not be used in the rain.
PLACE THE WELDING MACHINE ON A FIRM FLAT SURFACE.
IF EQUIPMENT OF THIS KIND TIPS OVER IT CAN HAVE VERY SERIOUS CONSEQUENCES.
The main switchboard where the machine has to be connected must be comprised of a differential circuit
breaker and a magnetothermal switch.
PLUG HOSE
"CETAC"
3P + T 63A
PLUG HOSE
"CETAC"
3P + T 63A
GALA INDUSTRIAL.. Instructions Manual.
Fig.2
Fig.3
INDUSTRIAL WALL SOCKET AND ELECTRICAL PROTECTION
INDUSTRIAL WALL SOCKET AND ELECTRICAL PROTECTION
SOCKET
AUTOMATIC CIRCUIT
BREAKER
DIFFERENTIAL
3P 63A / 300 mA
CIRCUIT BREAKER
SOCKET
AUTOMATIC CIRCUIT
BREAKER
DIFFERENTIAL
3P 63A / 300 mA
CIRCUIT BREAKER
20
3P 63A + TT
3P 40A-(400V)
3P 63A + TT
3P 63A-(230V)