Unpacking And Assembly - EMAK EF92C/13,5M Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

UNPACKING AND ASSEMBLY

3.
UNPACKING AND ASSEMBLY
For storage and transport reasons, some components of the machine are not
directly installed in the factory, but have to be assembled after their removal from
the packing. Final assembly is carried out by following these simple instructions.
IMPORTANT
starting up the engine, fill with oil and fuel following the instructions given in the
engine manual.
3.1 UNPACKING
When unpacking the machine, take care to gather all individual parts and fittings,
and do not damage the cutting deck when taking the machine off the base pallet.
The packing contents:
– the machine;
– the steering wheel;
– the seat;
– the grass-catcher brackets;
– the grass-catcher components;
– an envelope containing:
– the operator's manuals and documents,
– the nuts and bolts including a pin for blocking the steering wheel,
– 2 starter keys and a spare 6.3 A fuse.
NOTE
machine down from the pallet, take it to the maximum height and be very care-
ful.
For hydrostatic drive models: to make it easier to get the machine off the
pallet and to move it, the drive disengage lever should be put in position «B»
( ☛ 4.33).
The machine is supplied without engine oil or fuel. Before
To prevent damaging the cutting deck when getting the
EN 9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ef92c/13,5hOm92c/13,5mOm92c/13,5h

Tabla de contenido