ssembly Plan
PB 8208 Tremont Tunnel Twister Installation
PB 8316 Windward Go Back to Page 49
Fig. 1
2-1/2'' screws
1-1/4'' screw
Slide Barrier Cont.
1. Install Barrier Support Boards as shown in
(Fig. 1).
2. Install Barrier Boards as shown in (Fig. 1a).
3. Install (2) Slide Support Boards on the outside of your
barrier as shown in (Fig. 1b).
Note: Follow the intsructions included in your
Tunnel Twister Plan to assemble and attach
your slide and bracing.
FlUSH
(3)
per joint
Fig. 1a
(2)
1-1/4'' screws
per joint
2-3/8'' Gap
Between Each
Barrier Board
2-1/2'' screw
Fig. 1b
58
(2)
2-1/2'' screws
per joint
From Outside
(4)
2-1/2'' screws
per board