Wall Mounting - Ecolab EcoAdd Serie Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 750
6.2.2

Wall mounting

Fig. 11: Preparations for wall mounting
1.
Turn mounting plate over.
2.
Insert fastening elements (labelled: 1, Fig. 11, pos. 2) from behind into the two upper
openings marked "wall" (= wall mounting)and engage into position.
3.
Insert fastening elements (labelled: 2, Fig. 11, pos. 3 ) from behind into the two lower
openings marked "wall" and engage into position.
4.
Turn mounting plate over again and hold it against the required mounting position.
5.
Using mounting plate as a template, mark required boreholes with a sharp pencil.
6.
Make the holes.
7.
Fasten the mounting plate securely to the wall.
8.
Place pump onto the hooks on the mounting plate from above.
9.
Slide pump downwards onto the mounting plate until it engages with an audible click.
10.
11. Attach the connecting lines (hydraulic and electric):
Ä Chapter 6.3 'Hydraulic installation' on page 42
Ä Chapter 6.4 'Electrical installation' on page 50.
For wall mounting, fastening elements with the code 2 (Fig. 11, pos. 3)
and with code 1 (Fig. 11, pos. 2) are used.
The hooks of the fastening elements must point upwards.
To remove the pump from the mounting plate, push down on the fixing
bracket (Fig. 11, pos. 10).
Assembly and installation
41
417102276 Rev. 3-01.2019

Publicidad

Tabla de contenido
loading

Tabla de contenido