EdilKamin ADRIA Instalación Uso Y Mantenimiento página 31

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 62
MOUNTING THE COVERING
The boiler-stove is supplied with the sheet metal parts of
Fig. A
Fig. B
the covering already assembled (fig. A).
To assemble the ceramic front panels, supplied in separa-
te packaging, proceed as follows:
Fig. A
Remove the sheet metal top interlocked in place.
Fig. B
Remove the front sides made of sheet metal by sliding
them upwards.
Fig. C
Remove the metal support (1) by unscrewing the four
M5 screws.
Fig. C
Fig. D
Fig. D
Mount the upper ceramic front panel (2) on the metal
support (1) using the four M6 screws supplied and repo-
2
sition it on the stove securing it with the four M5 screws
previously removed.
1
Fig. E
1
Place the lower ceramic front panel (3) resting on the
front metal support (4), located under the door.
Secure it with the two M6 screws supplied.
Fig. F
Reposition the front sides made of sheet metal, inserting
them downwards and put the sheet metal top back in
place.
Fig. E
SMALLWARE INCLUDED:
4
nr. 6 Screws M5
nr. 6 Screws M6
3
Fig. F
31

Publicidad

Tabla de contenido
loading

Tabla de contenido