INSTRUCTIONS FOR USE
Filling the feed screw
If the pellet storage tank is completely emptied, it follows that the Archimedes' screw is also emptied. Before restarting the boiler-stove
you must fill it by following these steps: press the +/- keys simultaneously ( the synoptic panel) for a few seconds, after which, having
released the keys, the display will show the text "Reload".
It is quite normal for some pellet residue to remain inside the hopper, this is what the feed screw is unable to pick up. Once a month,
fully vacuum the hopper to prevent dusty residue from accumulating.
Automatic ignition
With the boiler-stove on stand-by, press the 0/1 button for 2 seconds (on the synoptic panel or remote control). This will start-up the
ignition process, 'Start' will appear on the display and a countdown will commence in seconds (1020). There is no preset time for the
ignition process: its duration will be automatically shortened if the control board detects that certain tests have been carried out posi-
tively. The flame appears after about 5 minutes.
Manual ignition
(in case of start up failure)
At a temperature lower than 3 °C – too low for the electrical resistance to become red hot - or if the resistance is temporarily not
working, you can use a firelighter to ignite the boiler-stove.
Insert a well-lit firelighter into the combustion chamber, close the door and press 0/1 on the synoptic panel or remote control.
Operating modes
Operating from synoptic panel/remote control. With the boiler-stove running or on stand-by, from the synoptic panel:
- press the + or – keys to increase or decrease the desired water temperature.
- by pressing the
key you can change the SET temperature of the boiler or of the secondary circuit in general, using the +/-
keys. It is possible to visualise (if the boiler probe is connected) the temperature of any boiler/external storage, by pressing the "boi-
ler" key the set value is displayed, by pressing the +/- keys while viewing the boiler value set that setting can be varied. If the boiler
probe is not connected dashes appear in place of the temperature (--.-° C).
Shutdown
While the boiler-stove is working pressing the 0/1 key for 2 seconds begins the shutdown process and "OFF" is displayed (for 10 minu-
tes).
The turning off phase includes:
-The interruption of falling pellets
-The circulation of running water.
Never pull the plug during shutdown.
N.B. Please note that the circulator runs until the water temperature drops below 40° C.
Setting the clock
Press the MENU button for 2 seconds and use the + and – keys to follow the instructions given on the display to access the 'Clock' menu.
This allows you to set the time on the electronic control board. Then press MENU and the following data appears in sequence – this
can be adjusted: day, month, year, hour, minutes, day of the week. When 'Save?' appears on the display, you can check that the set-
tings have been entered correctly before confirming. Press MENU to save the information ('Save OK' then appears on the display).
Programmer to ignite and shutdown the boiler-stove at various times during the week.
Press the MENU button on the synoptic panel for 2 seconds to access the time setting function and press the + key to access the wee-
kly timer function 'Program ON/OFF' will appear on the display.
The timer allows you to set a number of ignitions and shutdowns per day (up to a maximum of three), for each day of the week. As
you confirm via the MENU button, one of the following options will appear:
- No Prog. (no program is set)
- Program/daily (a single program is set for every day)-
- Program/weekly (a program is set for each day of the week)
33