Allmand NIGHT-LITE GR Serie Manual Del Operario página 14

Cadena
Ocultar thumbs Ver también para NIGHT-LITE GR Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Operating the Outriggers
The unit has left and right outriggers at the rear of the
machine.
WARNING
Rollover Hazard
Failure to deploy the outriggers before raising the light
tower could cause the light tower trailer to tip over,
resulting in death or serious injury. Always deploy the
outriggers before raising the light tower.
Failure to lock the stabilizer jack in the operating
position could cause the back of the light tower trailer
to fall, resulting in death or serious injury. Always be
sure to lock the stabilizer jack in the operating position
with the jack locking pin.
Stabilizer jacks must be supported by a flat, level solid
ground surface.
To deploy the outriggers:
1. Pull the outrigger locking pin (A, Figure 12).
2. Move the outrigger (B, Figure 12) out until the pin
locks the outrigger in the operating position.
Note: When initially shipped from the factory, the
outrigger jacks are toward the front of the machine
(not shown) for shipping purposes. They should be
toward the rear of the machine as shown in Figure 12.
Move the outrigger completely out, turn the outrigger
so the jack is toward the rear of the machine, and
install, making sure that the pin locks the outrigger in
the operating position.
3. Remove the stabilizer jack locking pin (C, Figure 12),
turn the jack into the operating position (D), and install
the stabilizer jack locking pin fully through the top and
bottom holes in the jack and outrigger.
4. Unfold the handle (E, Figure 13) of the stabilizer jack,
then turn clockwise (F) to lower the jack foot (G) until
firmly planted on the work site surface.
5. Repeat for the opposite outrigger and stabilizer jack.
To retract the outriggers:
1. Fully lift the stabilizer jack foot by turning the jack
handle counterclockwise.
2. Fold the handle.
3. Remove the stabilizer jack locking pin, turn the jack
into the transport position, and install the stabilizer
jack locking pin fully through the top and bottom holes
in the jack and outrigger.
4. Pull the outrigger locking pin, and move the outrigger
in until the pin locks the outrigger in the transport
position.
5. Do the same for the other stabilizer jack and
outrigger.
14
12
D
13
F
E
G
Preparing to Operate the Unit
Domestic Models
1. Make sure that the light tower trailer is level front to
back and side to side. See Leveling and Stabilizing
the Light Tower Trailer.
B
C
A
www.allmand.com

Publicidad

Tabla de contenido
loading

Tabla de contenido