中文
AE5811/AE5812/AE5813
EN
DE
RU
KO
PT
JA
ES
Chapter I Taking Delivery and Installation
I. Taking delivery
1.When you have received the air compressor, please check the quantity, model, specifications and accompanying documents against the
items listed in the packing list.
2.Visually check the air compressor and its accessories for damage due to shipment.
3.If you find any defect, please contact your supplier immediately.
II. Installation
Tip: Properly planning is required before installation to ensure proper compressor operation, easy maintenance as well as optimum
compressor efficiency and air quality.
1.Selection of installation site:
The installation site of air compressor shall be wisely selected to facilitate the maintenance in the future and to avoid the abnormal
operation of the air compressor due to unsatisfactory environment.
1-1. Altitude < 1,000 m, ambient temperature: -5-45℃ .
1-2. The compressor must be installed indoors, and good daylighting and lighting are required for facilitating operation and overhaul.
1-3. The ambient temperature shall be lower than 45° C to avoid the compressor operating at high temperature as the higher the ambient
temperature is the lower the efficiency of the air compressor and the air output are; in addition, the ambient temperature must be higher
than -5° C as well as higher than the freezing points of water and lubricating oil.
1-4. The environment shall have a low relative humid of air, low dust level, clean air and good ventilation.
1-5. If the environment is poor and the dust level is high in the factory, a vent pipe shall be installed in a way that set its air intake to a place
where the air is clean. Or install a pre-filter to optimize the service life of the parts in the air compressor system.
1-6. Sufficient space shall be reserved around the air compressor for maintenance and placing/taking out the components during repair.
The distance between four sides & top of the air compressor and the wall shall be at least one meter.
1-7. Where applicable, the user may install a crane to facilitate loading, unloading, repair and maintenance of the air compressor.
1-8. Air compressor will generate heat, especially the air-cooled air compressor, thus it must be set in the plant with good ventilation. It is
necessary to decide whether to install the blower/exhaust fan according to the direction of wind around the compressor unit. The flow of
air drawn in must be greater than the flow of air from the circulating fan or cooling fan of the air compressor, and the area of the cooling
air inlet must be large enough. In addition, a cowl can be installed at the outlet of the exhaust fan on the top of the air compressor, and the
hot air from the air compressor can be discharged via the cowl passage to keep the room temperature at 5-40° C.
1-9. This compressor is equipped with a PLC and an HMI. Therefore, keep it away from any strong radiation source and strong interference
source to ensure its programs operate accurately.
Fan on roof
Example of ventilation
Wall-mounted fan
Extracted heat
Air inlet
During the installation of the discharge duct, sufficient space for installing the flexible canvas joint must be reserved so that maintenance
can be easily carried out (so that there is enough space for removing parts such as the cover on the compressor when the cooler is
cleaned).
30