D
Tools Needed:
Install the side lock on the second
section of the door. Secure the lock
Power Drill
to the section with (4) 1/4"- 20 x
11/16" self drilling screws. Square the
7/16" Socket
lock assembly with the door section
Driver
and align with the square hole in the
vertical track. The side lock should be
spaced approximately 1/8" from the
section edge.
IMPORTANT: SIDE LOCKS MUST BE
REMOVED OR MADE INOPERATIVE IN
THE UNLOCKED POSITION IF AN
OPERATOR IS INSTALLED ON THE
DOOR.
NOTE: After completing this step,
continue with Step 9 on page 15.
D
DoorMaster
Tools Needed:
NOTE: When installing a DoorMaster
None
operator use the center bracket and
drive gear supplied with your operator
(located in DoorMaster
Slide the DoorMaster
gear assembly onto the TorqueMaster
spring tube, so that the drive gear/
center bracket assembly are in the
center of the TorqueMaster
tube.
NOTE: After completing this step,
continue with Step 20 on page 24.
Tools Needed:
Power Drill
To locate the center bracket, mark the
header halfway between the flagangles
1/8" Drill Bit
and level the TorqueMaster
7/16" Socket Driver
tube. Drill 1/8" pilot holes into header
for the lag screws. Fasten the metal
bracket to the header using (2) 1/4" x
1-1/2" lag screws.
NOTE: After completing this step,
continue with Step 28 on page 31.
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
Side Lock
Bracket
TM
A
TM
package).
TM
bracket/drive
TM
®
spring
®
B
spring
®
1/8"
(4) 1/4"- 20 X 11/16"
SELF DRILLING SCREWS
TM
DOORMASTER
BRACKET/
DRIVE GEAR ASSEMBLY
TORQUEMASTER
®
TUBE
CENTER
BRACKET
BUSHING
ASSEMBLY
(2) 1/4" X 1-1/2"
HEX HEAD LAG
SCREWS
39