4. INSTALLATION
1.3 AXIS LINE ASSEMBLY
- Lift the vertical axis line pipe (T). (Fig.25)
- Insert the rod (A) into the pipe, placing the chrome bushing (B) at the top.
- Tighten the rod (A) to the sleeve (M) with spanners.
- Lower the pipe
- Fix and tighten the flanges (F) with bolts.
- Lift the complete unit with suitable lifting equipment.
- Remove the lower bracket (S1).
- Lower until everything is resting on the upper bracket (S2).
- Insert the guide.
- Check that the shaft projection is equal to that of the pump.
- Continue assembling the various axis lines as explained above.
19