It is allowed to exceed filling pressure by not more than 10% since when the cylinder cools down, the pressure will
become the nominal working pressure. For recharging be sure that:
Air meets the requirements of EN 12021
The date of last pressure test is engraved onto the cylinder
Cylinder valve has to be kept shut whilst being sent to refilling to avoid moisture from entering it. Cylinder shall be
protected from shocks during transport and storage. Do not carry cylinders by the hand wheel valve.
8.2 Cleaning and disinfecting
After each use is necessary to clean the dirty parts. This should be done with warm soapy water. The rinse should be
done with fresh running water.
N.B.: If chemical products are used, follow the advice for concentration. Avoid the use of organic solvents that can
damage rubber and plastic
9.
TESTING
N.B.: The following tests shall in any case be performed after cleaning or repairs.
The demand valve membrane as well as all rubber parts shall be replaced (by trained and authorized personnel) if they
show signs of alteration or ageing (sticky, hardened, creased etc.). All fittings shall be free from evident alteration.
SPASCIANI S.p.A. supply on request the equipment for proper testing.
9.1 Demand valve tightness at +7 mbar
- Connect cylinder to pressure reducer. Cylinder shall be kept shut
- Connect the demand valve to the medium pressure line
- Release button (17) by pushing on rubber button (4)
- Connect the demand valve to the testing instrument
- Pump some air into the demand valve to reach a pressure of some +7 mbar. Pressure drop shall not exceed 1 mbar
within one minute.
9.2 Positive pressure of the demand valve
- Open cylinder valve
- Connect demand valve to testing equipment
- Release button (17) by pushing on rubber button (4)
- The control pressure gauge shall read 3.2 to 3.9 mbar.
9.3 Pressure in the cylinder
See par. 6.4.
9.4 Tightness of the high pressure section
See par. 6.5.
9.5 Warning device
See par. 6.6.
10.
STORAGE AND TRANSPORT
It is advisable to store the respirators herein described in suitable areas at normal room temperature, away from sun
light, humidity and corrosive chemicals. The pictograms on the label indicate the optimal conditions of storage.
For the carriage of cylinders, follow the instructions in the section. 8.1. For the transport of other components, it is not
required a special care, however it is recommended to use the original packaging of mask and regulator and follow the
directions provided for storage.
11.
SCHEDULED MAINTENANCE TABLE
The following table shows the maintenance schedule:
Part
Complete airline
Complete airline
Demand valve
Demand valve
Demand valve
Demand valve
High pressure connector
High pressure connector gasket
Reducer
Cylinder
Full face mask
1: Before allowing the use
4: Every six months
7: Every six years
a) After use in corrosive areas or in extreme ambient conditions
b) In accordance to national regulations
c) WARNING: Every time the valve is disassembled from the cylinder for maintenance and/or testing, the valve shall be
Activity
Cleaning
Function, tightness
Cleaning
Disinfecting
Membrane check
Membrane replacement
Thread test
Replacement
Revision
c
Test
See mask instruction
2: Before use
5: Annually
1
2
3
X
X
X
X
a
X
3: After use
6: Every three years
Pag. 16 / 36
4
5
6
7
X
X
X
X
X
X
b
X