Inspection On Reception; Handling / Movement - WEG ABW16 Manual De Instrucciones

Ocultar thumbs Ver también para ABW16:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

open Circuit Breaker

1.6 InSpeCtIon on reCeptIon

Immediately after receiving the product, check if its packaging is in perfect order.
Upon unpacking, make visual inspection of the circuit breaker, even before removing it
from the pallet. If there is any evidence of damages or imperfections caused by transport,
directly inform the carrier and WEG.
Also check if the information contained on the identification labels of the product correspond
to the item acquired.

1.7 HAnDlIng / MoVeMent

Fixed Circuit Breaker
Release the circuit breaker from the pallet, removing the fastening bolts.
Fit the removable hooks (supplied with each circuit breaker) in the position indicated in the
figure below and suspend it by means of a winch.
FITTING
POSITIONS
REMOVABLEHOOKS
removable Circuit Breaker
Before moving the removal circuit breaker, place it in the INSERTED (CONNECTED) position.
Greater details regarding the procedure in insertion may be found on page 26.
Release the circuit breaker from the pallet, removing the fastening bolts.
Suspend the circuit breaker by means of a winch, with suspension hooks fit into the 4
(four) suspension grommets located in the upper part of the removal carriage. Check the
figure below.
SUSPENSION
HOOKS
20 | ABW
English

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Abw20Abw25Abw32Abw40Abw50

Tabla de contenido