6. Restrictions on Schedule function
the Schedule function can be used in Intellectual Stack, the Schedule will be
executed. If not, it will not be executed.
X *2): This Schedule can be input to Web Control when the projectors are
operating in Intellectual Stack but it will not be executed.
X *3): This Schedule can neither be input to Web Control nor be executed when
the projectors are operating in Intellectual Stack.
• If the Schedule is
NOTE
accordance with the conditions set in Schedule Execution Error on Web
Control.
(Network Guide
• If the Schedule function is set to turn off the power when the projectors are
operating in Intellectual Stack, both the Main and Sub projectors will be turned
off.
• If the Schedule function on the Main projector is set to turn on the power, the
projectors will be turned on according to the LAMP MODE setting.
• When the two projectors are operating in the DUAL mode and a menu is being
displayed on one of the projectors, the Schedule function for My Image and
Messenger on the other projector will not be executed.
• Power Off in the table refers to turning off the power and entering into standby
mode according to the Intellectual Stack settings or by pressing the STANDBY/
ON button on the remote control or control panel of the Main projector.
• The projectors cannot be turned on by the Schedule function on the Sub
projector. Set it on the Main projector if necessary.
• When the Sub projector is turned off according to the ALTERNATE MODE
setting, the Schedule function on the Sub
executed without error.
LX41/LW41 User Manual - Instant Stack Guide
Restrictions on Schedule function
(continued)
not executed, an error message will be sent in
→
3. Web Control
projector to turn off its power will be
35
→
3.6 Alert
Settings)
020-000509-01 Rev.1 (06-2012)