PELLET LOADER INSTALLATION
Note:
side or on the left side of the mantel.
, depending on the position of the hearth, is man
datory so that it stays taut, in order to facilitate the pellets
dropping into the hopper.
test to make sure they drop correctly.
must not come into contact with the smoke channel.
Only mount the front or side wall of the mantel, onto which
the loading inlet will be attached;
complete the mantel only after verifying the correct opera
tion of the entire loading system.
Secure the loading inlet to the mantel using the self-tapping
screws supplied, using the holes on the mantel frame; reinforce
2nd phase
INSTALLING THE LOADING TUBE
E
using the clamps provided.
3rd phase
COMPLETING THE MANTEL
Before fully closing the mantel, carry out pellet loading test
to ensure the pellets are dropped correctly and there are no
obstacles to proper loading.
INSTALLATION
(supplied with a length
A
- 28
INLET
A
E
-
A
-