Maintenance; Stop Of Operation For Maintenance; Replace The Pump Tubes - Swan Analytical Instruments Cleaning Module-II Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Cleaning Module-II

Maintenance

6.
Maintenance
6.1.

Stop of Operation for Maintenance

1 Put the suction lances into a bucket with clean water.
2 Manually start a fill cycle on both channels:
3 Remove the suction lances from the water.
6.2.

Replace the Pump Tubes

The pump tubes [D] of the peristaltic pump are exposed to a mini-
mal wear. It is therefore recommended to exchange the pump
tubes annually.
Overview
A
B
C
D
20
<Maintenance>/<Cleaning>/<Fill channel 11>.
<Maintenance>/<Cleaning>/<Fill channel 12>.
Pump housing
Occlusion frame closed
Rotor
Pump tube
A
B
C
D
E
G
F
E
Pump inlet
F
Pump outlet
G
Protection cap
A-96.250.599 / 020620

Publicidad

Tabla de contenido
loading

Tabla de contenido