Chapter 2: Installation
Unpacking the Switch
To unpack an AT-GS900/xE switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the following hardware components are included in your
switch package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.
One AT-GS900/xE Gigabit Ethernet switch
Four self-adhesive rubber feet
Wall-mounting kit
External power supply
Documentation CD
Warranty card
26