Allied Telesis AT-GS900/5E Guia De Instalacion página 28

Tabla de contenido

Publicidad

Chapter 2: Installation
Warning
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord.
6. Verify that the POWER LED is green. If the LED is OFF, refer to
"Troubleshooting" on page 33 for instructions.
Note
The switch perform a self-diagnostic test upon power up. This takes
about 20 seconds to complete.
7. Power ON the end-nodes connected to the switch.
8. Check that all the L/A LEDs are green. If any of the LEDs is OFF, refer
to "Troubleshooting" on page 33 for instructions.
The switch is now ready for use.
5
28

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

At-gs900/8e

Tabla de contenido