4. SECURING THE SUPPORT BAR
Parts Required:
1
x
Support Bar (#26)
2
x
Screw (#C)
Installation:
•
Install the Support Bar to the rear of the unit between the two rear
Support Legs. Secure using one screws on each side. Ensure the support
bar is placed on the underside of the Main Cabinet, facing outwards.
Note illustration for support bar arrangement.
5. MOUNTING THE CART BRACKETS
Parts Required:
2
x
Grease Tray Brackets (#20)
1
x
Ash Clean-out Housing (#21)
1
x
Power Cord Bracket (#25)
10 x
Screw (#C)
2
x
Screw (#D)
Installation:
•
Locate the two holes on the Back-Right Support Leg. Mount the Power
Cord Bracket to the Back-Right Support Leg using two screws (C).
•
Mount the Ash Clean-out Bracket to the bottom of the Main Cabinet
with 4 screws (C). Fasten it with the Left and Right Front Panels using
one screw (D) on each panel.
•
Mount the Grease Tray Brackets to the bottom of the Main Cabinet
using four screws (C).
•
Fully-tighten all screws on the cart base. Next, carefully turn the unit
into an upright position, with the wheels on the bottom.
6. MOUNTING THE BACK HANDLE
Parts Required:
1
x
Hopper Handle (#6)
4
x
Screw (#B)
Installation:
•
Mount the Hopper Handle onto the back side of the hopper using four
screws.
4
26
C
5
21
25
C
C
C
D
D
6
B
C
20
B
6
9