Ecolab EcoAdd Instrucciones De Servicio página 373

Ocultar thumbs Ver también para EcoAdd:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 838
Pump head 5 l/h and 11 l/h
5
3
2
1
A
Fig. 93: Replacing the diaphragm and pump head
A
Adhesive label: Tightening torque of metering head
screws
1
Cover plate
2
Metering head screws (4 pcs.)
3
Pump head
4
Suction valve
1.
Unscrew the suction and pressure valves (items 4 and 5).
2.
Remove the cover plate (item 1) on the metering head.
3.
Loosen the metering head screws (item 2).
4.
Remove the pump head (item 3).
5.
Take out diaphragm (5) and intermediate plate (6).
6.
Remove the protective diaphragm (7) from the plunger.
7.
Fit new protective diaphragm in the correct position.
8.
Reverse this procedure for re-installation.
9
7
6
8
10
4
11
169
5
Pressure valve
6
Diaphragm
7
Intermediate plate
8
Diaphragm rupture drain
9
Protective diaphragm
10 Vent screw
MAN046939 Rev. 6-10.2021
Maintenance

Publicidad

Tabla de contenido
loading

Tabla de contenido