Setup

3
Setup
3.1

General setup

Fig. 1: Setup
1
Operator panel
2
Canister with detergent
3
Peristaltic pump (p-pump)
4
Suction hose
5
Water inlet
3.2

Detailed look at the water and electrical connections

CAUTION!
– You have to install a ball valve upstream of the 'WATER INLET' (pos. 1).
– This valve must be closed in 'BEVERAGE mode' !
– The 'DRAIN' overflow (pos. 3) must be connected to the drain.
– The drain pipe must run under the 'DRAIN' connection (pos. 3).
Fig. 2: Water and electrical connections
1
Water supply, Pressure: max. 0,8 MPa (8 bar), Flow rate: max. 3 l/min
2
Connection socket for power supply
3
Overflow, DN15, Flow rate: max. 4 l/min
A
Ball valve (art. no. 415502019) with flat sealing (art. no. 417000288)
Rev. 04-06.2018
6
Pressure vessel
7
Coupling to (Keg) module
7.1 Continuous air
7.2 Outlet for the medium (cleaning and rinsing process)
7.3 Control air