Maintenance; Maintenance Schedule; Other Maintenance Activities - Ecolab DM Modular 20 Instrucciones De Manejo

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 158

Maintenance

7
Maintenance
CAUTION!
Before conducting maintenance work, the power to the system must be
switched off and the water supply must be interrupted.
All safety guidelines must be observed à in particular those set out in section:
Ä Chapter 6.1 'Safety instructions for troubleshooting and maintenance'
on page 32.
Contact the manufacturer if you have any further questions regarding maintenance work;
see contact details in section:
on page 10.
7.1

Maintenance schedule

If regular checks show increased wear and tear, shorten the necessary maintenance
intervals to reflect the actual wear and tear.
Interval
During cleaning
On changing
containers
annually
7.2

Other maintenance activities

Fatty deposits build up because fingers come into contact with surfaces during
operation; these, combined with dust, make the display dirty.
Carefully clean the display on the control unit with a lint-free cloth.
ENVIRONMENT!
Environmental damage caused by incorrect disposal of cleaning agents!
Incorrect disposal of cleaning agents can cause environmental damage.
– Dispose of cleaning cloths soaked with detergent as domestic waste.
Rev. 04-06.2018
Ä 1.5 'Manufacturer's service and contact address'
Maintenance work
Check peristaltic hose for damage or wear.
Check unit is leak tight.
Check peristaltic hose for damage or wear.
Check filtering screen of suction hose and clean if necessary. Operator
Change peristaltic hose.
Check filtering screen of water supply for dirt and
clean if necessary.
34
Personnel
Operator
Operator
Mechanic
Mechanic

Publicidad

Tabla de contenido
loading

Tabla de contenido