Assembling The Box Platform - TUBESCA-COMABI NEOLIUM BOX 200 Instrucciones De Montaje Y De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 118
nd
Step 3: To assemble the 2
guard rail repeat step no. 2.

3-1-7. Assembling the box platform

1. Position one end of the box platform on rung no. 7, then slide the other end up and hook it
on to the rung on the opposite side.
2. Lock the platform in place by pushing down the anti-lift device.
3. Access the platform from inside the scaffolding.
2
1
Check that the anti-lift
device is correctly engaged
106-A000035566 - ind.D - 11/2021
59

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Neolium box 250Neolium box 300

Tabla de contenido