3-12. NEOLIUM BOX 200/250/300 12.00m platform assembly
• Closely follow the whole of chapter 2-5 to assemble the NEOLIUM BOX 200/250/300 10.00m
platform.
• Assemble the 2 x 2.00m extensions by following § 3-1-5.
• Assemble the 2 guard rails on rungs no. 51, and then no. 46, by following § 3-1-6.
• Mount the box platform on rung no. 47 by following § 3-1-7.
.
106-A000035566 - ind.D - 11/2021
72