3-8. NEOLIUM BOX 200/250/300 8.00m platform assembly
• Closely follow the whole of chapter 3-6 to assemble the NEOLIUM BOX 200/250/300 6.00m
platform.
• For the 8m platform and above, the stabiliser + extension set replaces the basic stabilisers.
• Assemble the stabiliser extensions by following § 3-8-1 p.25.
• Assemble the 2 x 2.00m extensions by following § 3-1-5.
• Assemble the 2 guard rails on rungs no. 35, and then no. 30, by following § 3-1-6.
• Mount the box platform on rung no. 31 by following § 3-1-7.
Collar clamp position:
Between the 2
rungs, and the 14
rungs
106-A000035566 - ind.D - 11/2021
nd
rd
and 3
th
th
and 15
65